Bunn CWT-TS User Manual
Page 6

Page 6
INITIAL SET-UP
CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except
when specified in the instructions.
1.
Insert an empty funnel into the funnel rails.
2.
Place an empty dispenser under the funnel.
3.
Place the heater switch at the rear of the brewer in the “OFF” lower position and connect the brewer to the
power source.
4.
Fill the tank with water as directed:
4A. Models CW-APS & CW-TS:
Pour three pitchers of tap water into the screened area on top of the brewer. Allow approximately two minutes
between pitchers for water to flow into the tank. While the third pitcher of water is entering the tank, the tank
will fill to capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
4B. Models CWT-APS, CWTF-APS, CWT-TS, CWTF-TS:
Connect the brewer to the power source, place the "ON/OFF" switch in the "ON" upper position, and
momentarily press and release the start switch. Water will begin flowing into the tank. When water stops
flowing into the tank, initiate a second and a third brew cycle. During the third brew cycle the tank will fill to
its capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
5.
When the flow of water from the funnel stops, place the heater switch at the rear of the brewer in the “ON”
upper position and wait approximately twenty minutes for the water in the tank to heat to the proper
temperature. Some water will drip from the funnel during this time; this is due to expansion and should not
occur thereafter.
6.
Empty the dispenser and initiate another brew cycle as directed:
6A. Models CW-APS & CW-TS:
Pour one pitcher of tap water into the screened area on top of the brewer.
6B. Models CWT-APS, CWTF-APS, CWT-TS, CWTF-TS:
Place the "ON/OFF" switch in the "ON" upper position, and momentarily press and release the start switch.
7.
Place the "ON/OFF" switch in the lower “OFF” position after water has stopped flowing from the funnel, and
let the water in the tank reheat to the proper temperature.
8.
Empty the dispenser and proceed as directed:
8A. Models CW-APS & CW-TS:
The brewer is now ready for use in accordance with the coffee brewing instructions on the next page.
8B. Models CWT-APS, CWTF-APS, CWT-TS, CWTF-TS:
Place the "ON/OFF" switch in the "ON" upper position, and momentarily press and release the start switch.
Check the water volume in the dispenser after water has stopped flowing from the funnel. It should be 64
ounces.
9.
If not, disconnect the brewer from the power source, remove the front panel, and adjust the brew timer dial
up-or-down as required. Replace the front panel, connect the brewer to the power source, and allow the water
to reheat, start, and measure another brew cycle.
10. Repeat step 9 until 64 oz water volume is achieved.
11. The brewer is now ready for use in accordance with the coffee brewing instructions on the next page.