CAUTION! For proper drainage, the unit must be mounted so the drain outlet is at

least 4” above the floor drain, and must be fully supported under the base.
4.4 Installing Feet

Included with your Quest 110 Dual are four leveling feet. It is important to level the
unit for proper draining.

Installing Leveling Feet

See Figure 2 for installing leveling feet.

1. Lay down a protective pad (pillow, blanket, etc.).

2. Carefully turn unit onto side opposite drain port.

3. Align leveling foot shaft with one of the four threaded hole locations as shown in Figure 2.

4. Screw each leveling foot in ten revolutions.

5. Carefully bring unit to upright position.

6. Level unit for proper water drainage.

7. Wait 10 minutes before operating.

CAUTION! Note: Operating the unit immediately after bringing it to an upright

position can possibly damage the compressor. A short amount of time is needed (10
minutes) to allow the oil to return to it’s reservoir for lubrication.

4.5 Condensate Water Removal

The Quest 110 Dual drains via gravity, therefore, it does not have the ability to push condensate (water)
uphill. The drain hose must run downhill toward the drain location. Condensate can be drained by using the
5/8” clear vinyl hose and the 3/4” threaded adapter provided. Ensure the threaded adapter is threaded in
tightly.

CAUTION!

The Quest 110 Dual drains via gravity, therefore, it does not have the ability to push

condensate (water) upwards. The drain hose must run down towards the drain location. Condensate can
be drained by using the 5/8” clear vinyl hose and the 3/4” threaded adapter provided. Ensure the threaded
adapter is threaded in tightly.

Figure 1: Four leveling feet.

Figure 2: Insert leveling feet in locations.