How to install the basic and metered pdu, Attach the cord retention trays, Attach cords to the tray – American Power Conversion AP7862J User Manual
Page 7: Mounting options

Basic and Metered Rack Power Distribution Unit
3
How to Install the Basic and Metered PDU
Attach the cord
retention trays
Attach the cord retention trays to the
PDU
, using four flat-head screws
(provided) per tray.
Attach cords to the tray
Attach a cord to the tray by looping the cord and securing it to the tray,
using a wire tie (provided).
Mounting options
Install the
PDU
in the rear of the NetShelter VX Enclosure, in the cable
channel directly behind the rear vertical mounting rails. You can install
the
PDU
in one of two ways: using toolless mounting pegs (provided) or
the mounting brackets (sold separately).
Note
Each cord must be secured to the tray so that you can
unplug it from the
PDU
without removing the wire tie.
Note
You can order a rack-mount bracket kit from
APC
(
AR8116BLK
).