10) Install the lower vessel support.

(2L & 5L Capacity Only)

• Loosen the locking handle.
• With the rubber side of support facing up, place above drain valve just so it touches the vessel.
• Fix lower vessel support to the reactor frame and tighten locking handle.

11) Attaching Tool-Free™ fittings.

Slide green locking ring over the glass fittings on the jacket followed by the PTFE split ring.

Assemble the Tool-Free™ hose flange, o-ring and green locking ring together, HAND TIGHTEN.