10) install the lower vessel support, 11) attaching tool-free™ fittings, 2l & 5l capacity only) – Chemglass Dual ChemRxnHub™ User Manual
Page 6
10) Install the lower vessel support.
(2L & 5L Capacity Only)
• Loosen the locking handle.
• With the rubber side of support facing up, place above drain valve just so it touches the vessel.
• Fix lower vessel support to the reactor frame and tighten locking handle.
11) Attaching Tool-Free™ fittings.
•
Slide green locking ring over the glass fittings on the jacket followed by the PTFE split ring.
•
Assemble the Tool-Free™ hose flange, o-ring and green locking ring together, HAND TIGHTEN.
3800 N. Mill Road
Vineland, NJ 08360
Phone: 800-843-1794
www.cglifesciences.com