10) install the lower vessel support, 11) attaching tool-free™ fittings, 2l & 5l capacity only) – Chemglass CG-1949-X User Manual
Page 6

10) Install the lower vessel support
(2L & 5L Capacity Only)
Loosen the locking handle.
With the rubber side of support facing up, place above drain valve just so it touches the vessel.
Fix lower vessel support to the reactor frame and tighten locking handle.
11) Attaching Tool-Free™ fittings
Slide green locking ring over the glass fittings on the jacket followed by the PTFE split ring.
Assemble the Tool-Free™ hose flange, o-ring and green locking ring together, HAND TIGHTEN.
3800 N. Mill Road
Vineland, NJ 08360
Phone: 800-843-1794
www.chemglass.com