beautypg.com

Dow FLOATING DOCKS, RAFTS AND BOAT WELLS User Manual

Page 3

background image

®™Trademark of The Dow Chemical Company (“Dow”) or an affiliated company of Dow

®™Trademark of The Dow Chemical Company (“Dow”) or an affiliated company of Dow

figure 6: bottom view of raft

figure 7: attaching billets

to bottom of raft

Part Name

Size, inch (cm)

Quantity

Needed

Sides

2 x 10 x 144 (5 x 25 x 366)

2

Ends

2 x 10 x 93 (5 x 25 x 236)

2

Deck Braces

2 x 10 x 141 (5 x 25 x 358)

2

Deck Braces

2 x 10 x 330 (5 x 25 x 76)

3

Skirts

2 x 6 x 144 (5 x 15 x 366)

2

Skirts

2 x 6 x 93 (5 x 15 x 236)

2

Cross Ties

2 x 6 x 96 (5 x 15 x 244)

4

Decking

2 x 6 x 96 (5 x 15 x 244)

24

Skids

2 x 6 x 134 (5 x 15 x 340)

3

Corners

4 x 4 x 16-1/4 (10 x 10 x 41) 4

Galvanized Carriage Bolts with Nuts
(or threaded rod cut to required length)

Diameter: 3/8 (0.95)

Length: 16 (41)

12

Galvanized Carriage Bolts with Nuts
(or threaded rod cut to required length)

Diameter: 3/8 (0.95)
Length: 6 (15)

16

Galvanized Nails

Length: 3-1/2 (9)

6 lbs (2.7 kg)

Galvanized Washers

Diameter: 3/8 (0.95)

28

STYROFOAM

Brand Buoyancy Billets

10 x 20 x 96 (25 x 51 x 244)

3

table 3: materials for swimming raft

figure 5: swimming raft plan

Decking

Corners

Deck braces

Sides and ends

Skirts

all around

Cross ties

6" (15 cm)

Carriage bolt –

washer under nut

12' (3.7 m)

8' (2.4 m)

STYROFOAM™ Brand Buoyancy Billets –

combined 1830 lbs (830 kg) buoyancy

Skids –

counterbore

1/2" (1.3 cm)

for carriage bolts

16" (41 cm)

Carriage bolt –

washer under nut

PLANS FOR A SWIMMING RAFT
These instructions describe the materials

needed and guidelines for building an 8'

x 12' (2.4 m x 3.7 m) swimming raft. The

materials needed are shown in Table 3.

The plans for the raft are shown in Figure 5.

CONSTRUCTION STEPS
1. Following the illustrations, create the

framework shown in Figure 6. With the

frame structure upside down, nail on

the four cross ties and the four skirt

boards.

2. Cut the three STYROFOAM

Brand

Buoyancy Billets in half for the six

shorter pieces shown in Figure 7.

3. Consulting Figure 7, lay the sections

of the STYROFOAM

Brand Buoyancy

Billets across the cross ties. Place

skids on the foam as shown. To

connect the foam, drill six holes

through the skids, foam and the cross

ties. Insert the long bolts and reach

under the cross ties to apply washers

and nuts.

4. Turn the structure over and tighten the

nuts to a snug fit.

5. Install lengthwise bracing first, then

install cross bracing.

6. Consulting Figure 4, nail on deck

boards using a piece of 1/2" (13 mm)

plywood to space boards 1/2" apart.