CertainTeed CTG_GreenGlue-Clip User Manual
Installation guide, Step 1
installation guide
installation guide
www.greengluecompany.com
866.435.8893
Step 1
Measure for placement of Green Glue Noiseproofing Clips using layout guidelines listed above.
Mark locations and install clips using appropriate screws.
Recommended screws by stud type
Wood:
Use #8 x 2-1/2”
coarse thread screws
Steel:
Use #8, 10 or 12 x 1-5/8”
Type S self-tapping screws
Concrete:
Use 3/16” dia x 2-1/4”
Tapcon or equal anchor Screw
Outermost clips must be spaced at every interval
10’
(2)
24”
(1)
48”
16”
(4)
6”
(3)
3”
Layout pattern for Green Glue Noiseproofing Clips
Install ceiling drywall before walls to allow for a
fire stop by butting ceiling drywall to studs
Green Glue Noiseproofing Clip layout
(1)
Clips are spaced no further than
48 inches apart horizontally
(2)
Hat channel must not be spaced
more than 24 inches vertically
(3)
Bottom clips must be less than 3
inches from the floor
(4)
Top clips must be less than 6
inches from the ceiling
*Clips must be placed at the outermost
studs on every piece of hat channel
Product Specifications
Width
1.25 inch
Height
4.25 inch
Depth
1 inch
Weight
.025 lbs
Max Spacing
48” on center
Recommended Load
36 lbs ~ 3 drywall layers
Max Safe Load
46 lbs ~ 4 drywall layers
Fail Load
300 lbs ~ 27 drywall layers