5. Install the purlins with (4)

3

/

8

” x 5.5” bolts,

(4) washers, (4) lock washers, and (4) nuts

each. Fully tighten all purlins.

6. For shelters with Dero Decker racks, install the DD

beams with (8) 5/8” x 2” carriage bolts, (8) lock

washers, and (8) nuts each. Leave finger-tight.

Carriage bolts at the end of the shelter should have

the heads facing out. See shelter assembly drawing

for specific DD beam placement locations.

7. For shelters with side panels, install the front and

side panel supports between every upright,

except where the door will be installed. Align

slots in the panel support with the slots in

the upright, drill 3/8” diameter holes, and fasten

with 3/8” wedge anchors with nuts finger-tight.

8. For polycarbonate panels, install the panels with (4)

8mm bolts and (4) lock washers. (2) 130mm bolts on

top and (2) 65mm bolts on the bottom. The bolts will be

received by square nuts that slide into the panel

grooves. The gap on top of the panel will be filled with

(2) 1.25” aluminum spacers and several washers if

needed. The uprights and panel supports may be

slightly moved in order to get the panels as square as

possible.

For wire mesh panels, install the panels with (4) 5/16”

bolts and (4) lock washers. (2) 5.5” bolts on top and (2)
3” bolts on the bottom. The bolts will be received by
rivet nuts in the panels. The gap on top of the panel will

be filled with (2) 1.25” aluminum spacers and several

washers if needed.

9. Once all the panels are properly placed,

tighten all the upright anchors and bolts

attaching the trusses. The carriage bolts

attaching the DD beams can also be tightened.