beautypg.com

Pocket shelter – American Bicycle Security Company Pocket Shelter User Manual

Page 5

background image

American Bicycle Security Company

P.O. Box 7359

Ventura, CA 93006

Ph: (800) 245-3723 or (805) 933-3688

Fax: (805) 933-1865

www.ameribike.com

Email:

[email protected]

Pocket Shelter

Installation Instructions –

Base Structure

Installation Steps:

1. Attach the RAFTER TOP to the UPRIGHT with (4) 3/8” x 1”

carriage bolts, nuts and washers. Repeat for all RAFTER

TOPS and UPRIGHTS.

2. Stand up the UPRIGHT ASSEMBLIES and

attach each PURLIN with (2) 3/8” x 1”

carriage bolts, nuts and washers. Continue

standing up UPRIGHT ASSEMBLIES and

attaching PURLINS if building a modular

shelter.

3. Attach each REAR PANEL SUPPORT with

(2) 3/8” x 3.25” bolts, (4) washers, and

(2) nuts. The surface with 21 holes should

be facing away from the shelter.

4. Using the UPRIGHT feet as a guide, drill

½” dia. x 5.5” holes in the concrete

footings at each UPRIGHT foot. Install (4)

½” dia. x 5.5” wedge anchors at each

UPRIGHT foot. See footing diagram for

more detail.