beautypg.com

Weekly preventive maintenance checklist – Alliance Laundry Systems UX18PVQM7 User Manual

Page 25

background image

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

Maintenance

23

9001001

Weekly Preventive Maintenance
Checklist

Machine

____________________________

Operator

___________________________

Month __________

Week Ending:

Checks

/

/

/

/

/

1. Check the machine for leaks:

a. Start an unloaded cycle to fill the machine.

b. Verify that door and door gasket do not leak.

c. Verify that the drain valve is operating.

2.

3.

4.

5.

6.

7.

This manual is related to the following products: