ACR Electronics Nauticast 2607 User Manual
Page 36

Installation Manual
32
Y1-03-0204 Rev.K
NOTE:
If installations are not in compliance to this requirement we cannot guarantee
operation nor accept a warranty issue.
Antenna Layout
The position of the VHF and GNSS
– antennas must be added to the existing antenna layout
of the vessel.
3.11.3 Power Supply
The NAUTICAST must be supplied from the emergency power source. A further requirement
is to connect AIS to the reserve power source of the GMDSS. A new battery capacity
calculation must then be undertaken. See sample in 9.1 (Samples for battery calculation)
Following documents are needed for the installation approval of the classification
Antenna Layout (arrangement)
Battery Calculation
Connection / Block
– Diagram with locations
Type Approval Certificate