Selecting a site – Allied Telesis AT-9900s Switches User Manual
Page 5

Installation and Safety Guide
5
Selecting a Site
You can install the switch in the following ways:
■
in a standard 19-inch rack (see
“Installing the Switch” on page 6
)
■
on a level surface such as a desktop or bench
When you install the switch, choose a site as follows:
■
for AT-8900 and AT-9900 switches, one that maintains an ambient
temperature from 0º C to 50º C (32º F to 122º F)
for AT-9900s switches, one that maintains an ambient temperature from 0º C
to 40º C (32º F to 104º F)
■
allows adequate airflow around the switch and its vents
■
is free of dust and moisture
■
maintains humidity from 5% to 80% non-condensing
■
has a reliable and earthed (grounded) power supply, preferably dedicated and
filtered
■
does not expose cabling to sources of electrical noise such as radio
transmitters, broadband amplifiers, power lines, electric motors, and
fluorescent fixtures
■
permits easy access to the switch’s power and cable connections
■
allows related network devices to be connected to the switch without
exceeding maximum cable lengths specified in the Hardware Reference
■
ensures that the switch is mounted evenly in the rack to prevent uneven
mechanical loading of the rack