Installing equipment, Cable management – Chatsworth Products N-Series TeraFrame® Gen 3 Network Cabinet User Manual
Page 21

21
Installing Equipment
The N-‐Series TeraFrame Gen 3 Cabinet supports all manufacturers’ equipment that conforms to the
EIA/ECA-‐310E standard. Most equipment attaches directly to the equipment mounting rails; however,
some manufacturers may provide brackets or slide assemblies that require additional installation.
Rack-‐mount unit (U) markings are clearly printed on the side of the equipment rails to simplify
installation of components. Align equipment with the U markings on each side of the cabinet before
securing the equipment.
NOTE: Equipment rails should be adjusted to the desired location (front to rear) prior
to installing equipment. See “Adjusting the Equipment Rails” on page 20.
The N-‐Series TeraFrame Gen 3 Cabinet is provided with hardware to secure equipment to the
mounting rails. This hardware includes 50 sets of M6 cage nuts and screws or 100 #12-‐24 screws
depending on rail style. Additional hardware is available separately (see “Other Accessories” on page
27).
Cable Management
CPI cable management products provide the proper cable bend radii for better data transmission;
fewer tangled cords and cable damage; and ease in moving, adding, and changing connections. The
products assist in complying with ANSI/TIA/EIA installation of Category 5/5e/6/6a and fiber cables.
Separate the cables by type, gather into bundles, and fasten loosely with hook and loop fasteners. CPI
offers Saf-‐T-‐Grip Straps to fasten cable bundles (P/N 0200X-‐series).
See “Accessories – Cable Management” on page 22 for more information.
ь