Adjusting the equipment rails, Installing the standard pdu brackets – Chatsworth Products N-Series TeraFrame® Gen 3 Network Cabinet User Manual
Page 20

20
Adjusting the Equipment Rails
1. Use a 13 mm socket wrench to loosen (but do not remove) the nuts securing the equipment rail to
the frame in two (2) locations.
2. Move the equipment rail forward or backward to the desired location.
3. Tighten the nuts in two (2) locations on cabinet.
Markings are provided on the frame to help align the equipment rails so that they are vertical as well
as in the same location as the rails on the opposite side of the frame.
Installing the Standard PDU Brackets
1. Choose the desired corner of the cabinet to install the PDU Brackets and install cage nuts in square
holes.
2. Position PDU bracket against vertical frame member and install 2 screws through holes into cage
nuts. Torque screws to 168 in-‐lb (19 Nm) using a Phillips screw driver.
3. Repeat for second PDU Bracket.