Adjusting  the  Equipment  Rails  

 

1. Use  a  13  mm  socket  wrench  to  loosen  (but  do  not  remove)  the  nuts  securing  the  equipment  rail  to  

the  frame  in  two  (2)  locations.  

 

2. Move  the  equipment  rail  forward  or  backward  to  the  desired  location.  

3. Tighten  the  nuts  in  two  (2)  locations  on  cabinet.  

Markings  are  provided  on  the  frame  to  help  align  the  equipment  rails  so  that  they  are  vertical  as  well  

as  in  the  same  location  as  the  rails  on  the  opposite  side  of  the  frame.  

 

Installing  the  Standard  PDU  Brackets  

 

1. Choose  the  desired  corner  of  the  cabinet  to  install  the  PDU  Brackets  and  install  cage  nuts  in  square  

holes.  

2. Position  PDU  bracket  against  vertical  frame  member  and  install  2  screws  through  holes  into  cage  

nuts.    Torque  screws  to  168  in-­‐lb  (19  Nm)  using  a  Phillips  screw  driver.      

3. Repeat  for  second  PDU  Bracket.