beautypg.com

Install the adjustable cable standoff, Save these instructions, 1a 2c – LBL Lighting T-Grid Clip User Manual

Page 2: 1a 3a

background image

2

SUPPORT POST

STANDOFF ROD

2 MM ALLEN
WRENCH

M4 SET SCREW

Push the standoff rod completely into the support post and

tighten the M4 set screw with the 2 MM Allen wrench.

Refer to the instruction provided with the standoff to

complete the installation.

Install the Adjustable Cable Standoff

Screw the cable post completely to the threaded nipple.

Refer to the instruction provided with the standoff to

complete the instruction.

CABLE POST

SAVE THESE INSTRUCTIONS!

7400 Linder Ave, Skokie, IL 60077

800.323.3226 - 847.626.6300

www.lbllighting.com

© 2014 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.

A Generation Brands Company

A Generation Brands Company

1A

2C

3

4

3

1A

3A

1

2

1