Connect the monorail to the transformer canopy, Save these instructions, 1a 2b 1a 2c – LBL Lighting MO Direct Feed Flush Elec Xfmr 60w 120v/12v LED User Manual
Page 2

2
Connect the MonoRail to the
Transformer Canopy
Remove the power feed cap from the power feed housing.
Completely back out the screw on the power feed cap.
NOTE:
The standoffs should be installed to support the
Monorail while connecting Monorail to the power feed
canopy. Refer to the instruction provided with the standoffs.
SCREW
POWER
FEED CAP
POWER FEED
HOUSING
Place the Monorail into the standoffs and power feed housings.
Screw the power feed cap completely to the power feed
housing. Make sure that the power feed cap is not cross
threaded.
POWER FEED
HOUSING
MONORAIL
POWER
FEED CAP
Tighten the screw on the power feed cap for proper power
connection.
POWER
FEED CAP
SCREW
SAVE THESE INSTRUCTIONS!
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2014 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
A Generation Brands Company
A Generation Brands Company
1A
1
2
3
4
5
2A
2
3
1A
2B
1A
2C
1
4
5