LBL Lighting 2-Circuit MO Isolating Connectors User Manual
Straight isolating connectors, Install the straight isolating connectors, Save these instructions
Installation Instructions for
Straight Isolating Connectors
1.1
ISOCONNECTORCL-M-2
980MR2SIC
1
Push the two 2-Circuit Monorail sections completely onto the
isolating connectors.
2-CIRCUIT
MONORAIL
ISOLATING
CONNECTOR
G
P
I
:
ENERAL RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product must be used with the LBL 2-Circuit Monorail
system only.
M3 SET SCREW
1.5 MM ALLEN
WRENCH
Tighten the M3 set screws firmly with the provided 1.5 MM
Allen wrench.
the set screws which
Do Not Over Tighten
may strip the thread.
Install the Straight Isolating
Connectors
2-Circuit Monorail
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2014 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
A Generation Brands Company
SAVE THESE INSTRUCTIONS!
A Generation Brands Company
1B
1A
1
2
1B
1A
1
2