LBL Lighting 2-Circuit MO Adjustable Cable Standoff User Manual
Adjustable cable standoffs, Installing the adjustable cable standoffs

Installation Instructions for
Adjustable Cable Standoffs
1.1
HANGER-CBL-_-2
980MR2ASP
1
Installing the Adjustable Cable Standoffs
G
P
I
:
ENERAL
RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product must be used with LBL 2-Circuit Monorail system only.
This instruction is for the following models:
Adjustable Cable Standoff 6' (HANGER-CBJ-_6-2)
Adjustable Cable Standoff 8' (HANGER-CBJ-_8-2)
Adjustable Cable Standoff 18' (HANGER-CBJ-_18-2)
Adjustable Cable Standoff 25' (HANGER-CBJ-_25-2)
2-Circuit Monorail
ANCHOR
Select a location on the ceiling where the Monorail is to be
mounted.
One way of marking the standoff locations on the ceiling is to
lay the Monorail on the floor underneath of the selected
location and by using a plumb bob pointing on the center of
the Monorail, mark the points on the ceiling.
Another way is to hold the Monorail directly against the ceiling
and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Screw the anchors in the rest of the way with a Phillips
screwdriver.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat these steps for each standoff.
ANCHOR
WASHER
#8 SCREW
THREADED NIPPLE
CEILING
1B
1A
1
2
3
4
6
5
4
6
1B
1A
5
7
1B
1C