Install the fixture, 2d 2c 2b – LBL Lighting Omni Medium User Manual
Page 2

2D
2C
2B
3
4
5
6
7
8
2
Install the anchor for the lag bolt at the point marked on the
wall.
For wet locations: Apply a thick bead of caulk around the
anchor point and the electrical box.
ANCHOR
CAULK
Mount the housing to the crossbar nipple with the nut and
lock washer provided.
Anchor the housing to the wall with lag bolts through the
metal and rubber washers provided.
Do not overtighten the lag bolts.
LAG BOLT
METAL WASHER
RUBBER WASHER
Place the housing on the crossbar nipple.
Mark the location of the end holes in the housing onto the
wall and remove the housing.
Install the Fixture
ANCHOR
2A
Feed the power line wires through the nipple in the crossbar
and screw the crossbar to the electrical box.
Connect the crossbar to a suitable ground in accordance with
local electrical codes.
CROSSBAR
SCREW
POWER LINE WIRES
GROUND
1
2
4
3
4
5
6
5
7
8
8