1f 1d – LBL Lighting Modular New York Medium/Large T8 User Manual
Page 2

1F
1D
2
Feed the power line wires through the crossbar nipple.
Mount the crossbar assembly to the electrical box holes with
the two #8-32 screws provided.
Connect the crossbar to a suitable ground according to local
electrical codes.
Install the anchors for the lag bolts at the points marked on
the wall.
Apply caulk around the anchor points and the electrical box.
ANCHOR
Mount the housing to the crossbar nipple with the nut and
lock washer provided.
Anchor the housing to the wall with lag bolts through the
metal and rubber washers provided.
Do not overtighten the lag bolts.
LAG BOLT
METAL WASHER
RUBBER WASHER
Place the housing on the crossbar nipple.
Mark the location of the end holes in the housing onto the
wall and remove the housing.
Feed the power line wires through the crossbar nipple.
Mount the crossbar assembly to the electrical box holes with
the two #8-32 screws provided.
Connect the crossbar to a suitable ground according to local
electrical codes.
CROSSBAR
ASSEMBLY
ELECTRICAL BOX HOLE
#8-32 SCREW
NIPPLE
1C
5
5
6
6
7
6
10
11
1E
8
9
11
12
13
9
8
9
13
12
13
11
10