Install the mounting plate install the backplate, Connect the power, Install the lamp – LBL Lighting Mia WCF User Manual
Page 2: 4a 3a

4A
3A
2
Install the Mounting Plate
Install the Backplate
Line up the two backplate slots with the two mounting plate
inner threaded holes.
Level the backplate horizontally and secure it to the electrical
box with the two long #8-32 screws provided.
LONG #8-32 SCREW
Connect the Power
Turn the power to the electrical box off.
Make sure that the mounting plate is grounded in accordance
with local electrical codes.
Connect the black fixture wire to the hot power line wire with
a wire nut.
Connect the white fixture wire to the neutral power line wire
with a wire nut.
Properly place all wires into the electrical box.
Install the Lamp
Use
Watt type T5 Linear fluorescent lamp.
Max 14
Line up the lamp pins on both sides with the opening on the
sockets.
Insert the pins all the way into the sockets and turn the lamp
to lock it in place. Repeat this step for the other lamp.
Make sure the two inner threaded holes on the mounting
plate are positioned vertically.
Line up two mounting plate slots with the two electrical box
holes.
Level the mounting plate vertically and secure it to the
electrical box with the two short #8-32 screws provided.
NOTE:
For vertical installation the inner threaded holes
must be in horizontal position.
SHORT #8-32
SCREW
MOUNTING PLATE
INNER THREADED HOLE
INNER THREADED HOLE
2A
3
1
1
2
3
1
3
4
5
1
2
3
3
4
1
2
2
2
1
2
5A
2
1