2d 2f 2e 2g – LBL Lighting MEZZO P User Manual
Page 3
3
Connect the mounting plate and the fixture ground wire
to a suitable ground in accordance with local electrical
codes.
Connect the insulated wire with the white tracer to the
neutral power line wire with a wire nut.
Connect the other insulated wire to the hot power line
wire with a wire nut.
4"
Leave 6" of the cord behind the canopy for power
connections. Cut the excess cord.
From the end of the cord, strip the insulation 4" using a
sharp knife.
.
Make sure not to nick the inner wires
Strip the end of the wires.
Feed the fixture wires through the mounting plate
center hole and then pull them out of the electrical box.
Note: If the cord has a cloth cover, peel back or remove
the cloth where the secondary strain relief is installed.
Install the secondary strain relief by first feeding the
power cord through it.
Snap the strain relief tab into place.
Pull the cord to take up the slack and fit the rest of the
cord in the strain relief’s openings.
TAB
Place all wires, wire nut connections, and the secondary
strain relief properly inside the electrical box.
Loosen the set screw on the primary strain relief.
Align the canopy center hole with the mounting plate
center hole.
Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the
crossbar.
Do not turn the cord.
Push the cord into the canopy and line up the marked
point on the cord with bottom of the primary strain
relief.
Tighten the plastic set screw to secure the cord.
Screw the strain relief housing back onto the housing
cap.
STRAIN RELIEF
NOTE:
It is recommended that one person hold the
fixture while the electrician finishes the installation.
CORD
SET SCREW
2D
2F
2E
2G
9
7
8
6
10
11
12
13
14
15
16
17
18
19
20
21
22
STRAIN RELIEF
HOUSING
9
11
10
12
12
14
15
13