Installation – Siemens LC955KA40 User Manual
Page 28
28
Installation
Warning: The interior walls of the flue
panelling can have sharp edges – Risk of
injury –.
We recommend that you wear gloves when
installing.
14. Insert the cover panels at an angle and
tilt them back.
The bottom panel must snap in the
bolts at the back.
17. Insert the grease filter (refer to
Operating Instructions).
15. Slide out the upper section and attach
it to the mounting brackets at the sides
with two screws.
10. Connect up the air outlet pipe.
11. Connect the hood to the electricity
supply.
12. Remove the protective film from the
two flue ducts.
ṇ
Take care not to damage the
surfaces which are susceptible to
scratches etc.
13. Push both sections of the flue panelling
together (slots in the upper section
must be pointing downwards) and
insert into the opening in the extractor
hood.
ṇ
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
16. Unscrew the
two transport
braces.
0
8. Screw in lower screws (hex screws).
ṇ
If any pressure is exerted on the
glass screen when tightening the
screws it could lead to glass breakage.
0
9. Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.