Filling the main tube, Start – Wagner Paint-N-Roll Plus User Manual
Page 3
![background image](/manuals/413879/3/background.png)
3
English
1. Filling the
main tube
Start
Before filling:
Your Paint N Roll™ can be used with two types
of container lids that are used to allow you to
pull material from the material container into the
Paint N Roll™.
The lid below is desiged for use with standard,
one-gallon, round material containers. This lid
comes standard with your Paint N Roll™.
Use the lid shown below if you are using
something other than a standard, one-gallon,
round material container. *not included with
all models.
Attaching the container lid / fill tube
Filling the main tube
1. Apply a thin layer of petroleum
jelly to the fill tube. This will help
the fill valve slide easily off the fill
tube.
1. Slide the small end of the fill tube
(a) through the hole in the container
lid you plan to use.
2. Press down and firmly hold the fill
valve onto the fill tube.
3. Pull the plunger to draw the
material into the main tube. When
the tube is full, you are ready to
begin using the Paint N Roll™.
2a. Standard containers - Attach the
container lid with fill tube securely
to the material container.
2b. all other containers - Thread the
container lid with fill tube onto the
material container.
(a)
(a)
1
1
2
3
2
OR