Waterloo F1881 User Manual
Page 5
GAS SPRING INSTALLATION
Items Needed:
Gas Spring (Qty: 2)
M8-1.25 Hex Lock Nut (Qty: 4)
12mm Wrench
13mm Wrench
Process:
NOTE: Mount both Swivel Casters on the same side of the
unit as the handle.
• Attach Rigid Casters and Swivel Casters using (4) M8-
1.25 x 16mm Hex Head Screw, (4) M8 Washer, and (4)
M8-1.25 Hex Lock Nut in each caster.
• Wrench tighten.
• Discard screws in caster package (if supplied).
CASTER INSTALLATION
Items Needed:
Rigid Casters (Qty: 2)
Swivel Casters (Qty: 2)
M8-1.25 x 16mm Hex Head Screw (Qty: 16)
M8 Washer (Qty: 16)
M8-1.25 Hex Lock Nut (Qty: 16)
13mm Wrench
14mm Wrench
Process:
NOTE: Gas Spring must be installed with the cartridge
attached to lid (as shown).
• Insert threaded rod through hole in lid and secure with
locking nut.
• Insert bottom of Gas Spring in hole in divider rail and
secure with locking nut.
• Repeat for opposite side.
• Wrench tighten all fasteners on unit.
1.90
3.00
LOGO LABEL PLACEMENT
Process:
• Peel backing from logo label and position the label in
the upper right corner of the cart, using the dimensions
shown as a guide.
• Empty the drawer.
• Fully extend the drawer
Lever Style - Lift or lower (depending on the slide) the
release lever on both sides, (this allows the slides to ride
over the stops.) Pull out to remove.
5
OPERATION
Gas Spring
Nut
REMOVING DRAWERS
Release
Tab Style - Depress the release tabs on both sides,
(this allows the slides to ride over the stops.) Pull out to
remove.