Hydraulic installation, Wiring installation, Hydraulic set-up -13 – Summers 53' Trail-Type Superroller User Manual
Page 23
SECTION 2 - ASSEMBLY
Hydraulic Installation
H1.
Install Hydraulic components as shown on Page 2-12.
A.
Leave enough slack at all pivot points to allow folding machine without stretching or pinching
hydraulic hoses.
B.
Secure hoses with nylon ties and clamps provided. Do not over tighten clamps.
H2.
Make sure all hoses are routed the same on each side of the machine.
H3.
Secure hose with the provided clamps and hardware, use nylon ties where needed.
Wiring Installation
W1. Install lights as shown in Figure 8.
W2. Secure wires with nylon ties.
W3. Install rear lights as shown. Secure with hardware provided.
2-13
This manual is related to the following products: