Main frame transport frame installation – Summers 53' Trail-Type Superroller User Manual
Page 16
SECTION 2 - ASSEMBLY
A
8T4101 OFFSET
2/28/2013
9LR6242.iam/
0''4&5("150*/4*%&
2-6
Main Frame Transport Frame Installation
T1. Loosely position 8T4100 on the main frame and affix the hardware associated with 8T4100.
Do not tighten the fasteners. 8T4100 should always be positioned as shown, with the offset
gap to the inside.
T2. Position the transport frame at the rear of the main frame, note the orientation of the cylinders
clevis. Raise the transport frame so that pin 8T3640 can be driven into 8T4100. Note the
orientation of the pin, the cross hole should be towards the outside of the machine. Secure
the pin with hardware shown. Make sure the transport frame is centered and tighten all hard-
ware from step T1.
T3. Attach the hydraulic cylinder to the main frame, with the hardware shown in the diagram. Note
the number of washers on each side of the pin and the orientation of the cylinder ports.
T4. Insert the spindles into the spindle receiver on the transport frame. Secure with the hardware
shown.
T5. Install the tires, torque the wheel nuts 240 ft-lbs.