Hawkeye Model 750 User Manual
Hawkeye Sensors
► Pipe Wrench
► Cresent Wrench
► Thread Sealant
► Cable Cutter
This document contains the recommended procedures for installing a Hawkeye Industries Model 750 & Model 750 LS Gauge Head.
Requirements
Ensure that the tank is prepared to accept a Model 750 Gauge
Head (per Tank Preperation Instructions,) and has been fitted with
a float and float guide kit.
Contents
Tools
Parts Required
A.) Installing Model 750 Gauge Head
A.) Installing Model 750 Gauge Head
Remove the idler pulleys by pulling the hair pins and axle pins. Thread the
float cable, cut end first, through the 1½ NPT connection on the gauge
head.
Feed the stud end of the float cable through the gauge head coupling
down into the tank.
Replace the idler pulleys and pins so that the cable runs over top of both
pulleys. Secure the cut end of the float cable in position so that it does not
slide back through the gauge head.
TANK PREPARATION | GAUGE BOARD KIT INSTALLATION | FLOAT GUIDE KIT INSTALLATION |
GAUGE HEAD INSTALLATION
| GOSHAWK INSTALLATION
Installation Instructions
Model 750 / 750 LS Gauge Head
QTY
Part
►
1
Model 750 or Model 750LS Gauge Head
►
1
Float Cable Assembly for specified tank height
CLAMP OR
TAPE IN PLACE
1.)
2.)
3.)
4.)
►
►
Model 750 Instructions, September 2013
1
►
Apply thread sealant to the 1½ NPT threads of the gauge head and
tighten it into the 1½ NPT coupling on the tank with a pipe wrench. Ensure
that the open side of the gauge is aligned with the gauge board and faces
towards the board.
APPLY THREAD SEALANT
Skip this step for Model
750 LS Gauge Heads.