beautypg.com

0 care and maintenance, 0 troubleshooting, 0 care and maintenance -9 8.0 troubleshooting -9 – ARI Armaturen CHECKO-D PN40 EN User Manual

Page 9

background image

Rev. 0040106000 1613

Page 2-9

Operating and installation instructions

CHECKO

®

-V PN6-160 / CHECKO

®

-D PN40

7.0 Care and maintenance

Maintanance and maintenance-intervals have to be defined by the operator according to
the requirements.

CHECKO

®

-V:

- Before reassembling the unit, remember that the bearing surface must be cleaned and a

new gasket (pos. 7) must be inserted.

- Set the cover in place.
- Tighten the hexagon nuts (hexagon screws for valves of cast iron) evenly crosswise.
- Tightening torque‘s for hexagon nuts / screws:

8.0 Troubleshooting

In the event of malfunction or faulty operating performance check that the installation and
adjustment work has been carried out and completed in accordance with these Operating
Instructions.

If malfunctions cannot be eliminate with the help of the following table
9.0 Troubleshooting table”, the supplier or manufacturer should be consulted.

ATTENTION !
- See point 10.0 and 11.0 be
fore dismantling the valve.

PN DN

hexagon nuts /

hexagon screws

Torque

(Nm)

6 - 40

15- 32

M 10

15-30

40- 65

M 12

35-50

80-100

M 16

75-100

125-150

M 16

80-120

200

M 20

150-200

250-400

M 24

340-410

500

M 27

340-410

63 - 160

10 - 25

M 16

50

±2

32 - 50

M 20

150

±3

-

ATTENTION !
It is essential that the safety regulations are observed when identifying faults.

This manual is related to the following products: