beautypg.com

Jesel INS-01911 Chevy BB 1 Piece Intake, Indv. Exhaust Stands User Manual

Chevrolet bb, Instruction sheet, One piece intake / individual exhaust stands

background image

Instruction Sheet

Chevrolet BB

One Piece Intake / Individual Exhaust Stands

INS-01911

1985 Cedarbridge Ave

Lakewood, NJ 08701

732-901-1800

THESE INSTRUCTION SHEETS ARE INTENDED AS REPRESENTATIONS ONLY. JESEL IS IN NO EVENT LIABLE FOR CONSEQUENTIAL DAMAGE, INSTALLATION COST

OR OTHER COST OF ANY NATURE. NO REPRESENTATIVE IS AUTHORIZED TO ASSUME FOR JESEL ANY OTHER LIABILITY IN CONNECTION WITH ANY JESEL

PRODUCT. NOT RESPONSIBLE FOR TYPOGRAPHICAL ERRORS.

1985 Cedarbridge Ave ∙ Lakewood, NJ 08701 ∙

Phone:

732-901-1800 ∙

Fax:

732-901-6777

revised 07/08

STEP 1:

THE

CYLINDER HEAD MUST BE MACHINED

PRIOR TO INSTALLING THIS KIT. IF YOUR HEAD HAS

NOT BEEN MACHINED, PLEASE FOLLOW DIRECTIONS
FOUND ON

INS-24017

. JESEL CAN PERFORM THIS

MACHINING OPERATION FOR YOU IF NEEDED.

VALVETRAIN INNOVATION

STEP 2:

LOOSELY BOLT THE ONE-PIECE INTAKE

STAND AND CHECK GEOMETRY USING THE AVAILABLE

STAND HEIGHT CHECKING TOOL. IF THE STAND IS
LOW, A SHIM KIT

(KRS-28150)

IS AVAILABLE TO RAISE

THE STAND. IF THE STAND IS SITTING TO HIGH, THE

HEAD WILL HAVE TO BE MILLED OR LASH CAPS MAY

BE USED. ONCE THE CORRECT HEIGHT IS ACHIEVED,

APPLY THREAD SEALANT TO THE INTAKE STAND
BOLTS AND

TORQUE

TO SPECS LISTED ON PAGE 2

STEP 3:

LOOSELY BOLT THE EXHAUST STANDS TO

THE HEAD AND CHECK FOR PROPER GEOMETRY.

ONCE PROPER STAND HEIGHT HAS BEEN ACHIEVED,
APPLY ENGINE OIL TO THE THREADS AND

TORQUE

TO THE SPECS LISTED ON PAGE 2. THE EXHAUST

STANDS MAY BE WELDED TO THE INTAKE BAR ONCE

PROPER GEOMETRY IS ACHIEVED. ALWAYS USE THE
LONGEST MOUNTING BOLTS POSSIBLE.

STEP 4:

LUBRICATE

THE TIPS OF THE INTAKE AND

EXHAUST PUSHRODS USING THE SUPPLIED HIGH

PRESSURE LUBE. INSTALL EACH ROCKER ARM WHEN
THE CAM LOBE IS ON ITS BASE CIRCLE AND

TORQUE

THE 5/16-18 X 1.250” SHAFT BOLT TO PROPER SPEC.

NEVER TORQUE SHAFT BOLTS WHEN THE ROCKER

IS UNDER ANY SPRING LOAD AS SHAFT DAMAGE

MAY OCCUR. RETORQUE ALL MOUNTING HARDWARE
AFTER INITIAL BREAK-IN.

SHOWN WITH OPTIONAL ARP SHAFT BOLTS