Gas connection instructions, Inst – Anetsberger Brothers SLG40 User Manual
Page 9
9
GAS CONNECTION INSTRUCTIONS
GAS CONNECTION INSTRUCTIONS
GAS CONNECTION INSTRUCTIONS
GAS CONNECTION INSTRUCTIONS
GAS CONNECTION INSTRUCTIONS
Installing your
ANETS Fryer requires the fol-
lowing procedure, after its legs or casters are pro-
perly attached and it is in its desired location.
1. Ensure that the gas safety valve control knob
in the fryer has its OFF position next to the
valvemark.
2. Ensure that the gas supply inlet line valve is
closed (crosswise to the line direction).
3. Ensure that the fryer’s thermostat is set to
OFF.
4. Connect the ½” gas supply line to the gas line
adapter on the lower rear of the fryer.
5. Turn the gas supply line valve ON; then, check
all gas supply line joints and couplings for
leaks using soap suds or a leak-check solu-
tion, after the fryer is in its desired location.
6. Refer to Fryer Operation Recommenda-
tions and Fryer Operating Instructions to
begin using your
ANETS Fryer.
CASTER LEVELING INSTRUCTIONS
(Continued)
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION REQ
TION REQ
TION REQ
TION REQ
TION REQUIREMENTS
UIREMENTS
UIREMENTS
UIREMENTS
UIREMENTS
(Continued)
6. Reinsert each mounting bolt through the
caster mounting plate; next, place a spacer of
the required size on the bolt before inserting
the bolt into the bottom of the fryer.
7. Repeat step 6 for all remaining bolts.
8. Tighten all four bolts with locking nuts evenly
and securely against the bottom of the fryer.
9. Return the fryer to its desired location. Lock
the front casters to prevent fryer movement
and check again for wobbling or rocking.
Repeat steps 4 through 8 until no wobbl-
ing or rocking occurs. When the fryer no
longer wobbles or rocks, perform step 10.
10. Next, perform the “Fryer Restraining
Device Installation Instructions.”
!
WARNING
DO NOT use a flame to check for leaks.