beautypg.com

Installing the controller hardware, Before beginning the installation, Preparing the server – HP ProLiant DL580 G4 Server User Manual

Page 10: Installing the controller board

background image

Installing the controller hardware 10

Installing the controller hardware

In this section

Before beginning the installation .............................................................................................................. 10
Preparing the server
............................................................................................................................... 10
Installing the controller board
.................................................................................................................. 10
Connecting storage devices..................................................................................................................... 11

Before beginning the installation

Before beginning the installation procedure, visit the HP website (

http://www.hp.com/support

) to confirm

that you have the latest version of each driver and utility file needed. Compare the version numbers of the
files there with those of the same files on the software CD or DVD that is supplied in the controller kit.

Preparing the server

1.

Back up all data.

2.

Close all applications.

3.

Power down the server.

CAUTION: In systems that use external data storage, be sure that the server is the first unit to be powered

down and the last to be powered back up. Taking this precaution ensures that the system does not
erroneously mark the drives as failed when the server is powered up.

4.

Power down all peripheral devices that are attached to the server.

5.

Unplug the AC power cord from the outlet and then from the server.

6.

Disconnect all peripheral devices from the server.

Installing the controller board

WARNING: To reduce the risk of personal injury or damage to the equipment, consult the

safety information and user documentation provided with the server before attempting
the installation.

Many servers are capable of providing energy levels that are considered hazardous and are

intended to be serviced only by qualified personnel who have been trained to deal with
these hazards. Do not remove enclosures or attempt to bypass any interlocks that may
be provided for the purpose of removing these hazardous conditions.

1.

Remove or open the access panel.

2.

Select an available x8 or larger PCI Express slot.

3.

Remove the slot cover. Save the retaining screw if one is present.

This manual is related to the following products: