beautypg.com

Server operations, Powering up the server, Powering down the server – HP ProLiant DL320 G3 Server User Manual

Page 19

background image

19


Server operations

In this section

Powering up the server .................................................................................................................

19

Powering down the server ............................................................................................................

19

Preparation procedures .................................................................................................................

20

Extending the server from the rack...............................................................................................

21

Removing the access panel...........................................................................................................

21

Installing the access panel ............................................................................................................

22

Removing the PCI riser board assembly ......................................................................................

22

Installing PCI riser board assembly..............................................................................................

23

Removing the hot-plug SATA backplane.....................................................................................

24

Removing the fan assembly..........................................................................................................

25

Installing the fan assembly ...........................................................................................................

26

Powering up the server

To power up the server, press the Power On/Standby button.

Powering down the server

WARNING: To reduce the risk of personal injury, electric

shock, or damage to the equipment, remove the power cord to
remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the
power supply and some internal circuitry remain active until AC
power is removed.

IMPORTANT: If installing a hot-plug device, it is not necessary to
power down the server.

1. Back up the server data.

2. Shut down the operating system as directed by the operating system

documentation.