Figure 72 new plan dialog box, Opening a plan, Figure 73 open plan dialog box – HP StorageWorks 2.32 Edge Switch User Manual

Page 115: Adding devices, 72 new plan dialog box, 73 open plan dialog box

background image

HA-Fabric Manager user guide 115

The New Plan dialog box appears (

Figure 72

).

Figure 72

New Plan dialog box

2.

Enter a name in the New Plan box.

3.

Select one of the following options:
Start with discovered topology to use the discovered topology as the basis for the new

plan

Start Empty to start the new plan with an empty topology

4.

Click OK.

Opening a plan

1.

Select SAN > Open Plan from the Planning window menu bar (or press Ctrl+O).
The Open Plan dialog box appears (

Figure 73

).

Figure 73

Open Plan dialog box

2.

Select a plan from the Open Plan list.

3.

Click OK.

Adding devices

You can add one device or multiple devices to the plan.

To add one device:
a. Click a device icon on the devices toolbox.
b. Click the Physical Map in the Planning window.

The new planned device icon appears on the Physical Map.

To add multiple devices:
a. Click the devices icon on the devices toolbox.