beautypg.com

Mounting loader, Remove bolts, nuts and washers from hinge, Attaching pin on bucket – Alamo RHINO 2409 User Manual

Page 42: Mounting loader -6 attaching pin on bucket -6, Assembly, Assembl y

background image

ASSEMBLY

2409 01/11

Assembly Section 3-6

© 2011 Alamo Group Inc.

ASSEMBL

Y

Mounting Loader

Mounting is basically reverse of dismounting.

1. Slowly drive tractor up to loader until hoses will reach from loader to tractor. Engage tractor brakes and

shut off tractor engine.

2. Make sure quick couplers are clean and connect between tractor and loader, matching color coded bands.
3. Remove bolts, nuts and washers from hinge.
4. Start tractor engine and release tractor brakes. Slowly drive tractor ahead until front mounting brackets are

directly under loader catch flats. Activate lift control lever so that catch flats hook securely on front
mounting bracket tubes. Continue driving loader forward while rolling the loader on the front mounting
bracket tubes until side frame uprights are fully resting on midmounting assembly. Engage tractor brakes
and shut off engine.

5. Hook rubber strap around hoses and back on itself. Attach other end of rubber strap to bolt at front of

corner or side frame.

6. Clamp hinge assembly around midmounting tube. Install bolts, washers and nuts. Torque cap screws to

126 Ft. Lbs.

Attaching Pin on Bucket

Always wear safety glasses when removing or installing buckets.

Material bucket can be installed using tool ordinarily available.

1. Attach bucket to lift boom frame and cylinders

with four 1” pins, use two 3/8 shoulder bolts and
3/8 lock nuts at upper pin (bucket cylinder). Use
two 3/8 x 1.25 hex bolts, 3/8 jam nut, 3/8 flat
washer and 3/8 lock nut at lower pin. Position
bolt with head on inside of outer bucket ear.
Fasten bolt to ear using 3/8 jam nut. Install pin
so pin head is over jam nut and retain with 3/8
flat washer and 3/8 lock nut.

2. Install level indicator rod in level guide tube on

right bucket cylinder. Sandwich level indicator
rod angle between right inside bucket ear and
cylinder rod end.

3. Set bucket level on ground and adjust level

guide tube along bucket cylinder until end of
guide tube is flush with end of rod.