beautypg.com

4 stepping switch/time switches, inductive loads, 3 connecting the eco-ir – Timeguard 202.0.000 User Manual

Page 9

background image

4

4.4 Stepping switch/time switches

The ECO-IR must not be used to trigger stepping switches. The unit may

only be connected in parallel to time switches.

4. Inductive loads

Inductive loads must be interference-suppressed with suitable spark extin-

guishers (e.g. RC combination)

GB

L N

B1 B2

L

N

ECO-IR 540B2

A

ECO-IR 540B2

L N

A

L

N

ECO-IR 540B2

L N

A

B1 B2

B1 B2

All of the ECO-IR units connected in parallel must be con-

nected to the same mains phase. The overall permissible

load as a result of the parallel connection is not higher.

4.3 Connecting the ECO-IR

Connect the power section of the ECO-IR 540B2 as shown in the diagram:

HVAC

HVAC