beautypg.com

3 starting the loader, 4 changing the conveying sequence, Danger – Sterlco SPL Series Powder Hopper Loader User Manual

Page 29: Before, Only

background image

Powder Hopper Loaders

Page 29

5-3 Starting the Loader

1. Insert the pickup probe into the material supply.

2. Turn on compressed air to the unit.

3. Plug in power to the control enclosure.

4. Move the power switch on the Series One graphic panel to
the

ON

position.

5-4 Changing the Conveying Sequence

DANGER!

DISCONNECT POWER

BEFORE

OPENING THE CONTROL BOX.

Electric current, CAPABLE OF
CAUSING INJURY OR DEATH

, MAY BE

PRESENT in the controller enclosure
during these procedures.

The adjustments listed in this section
must be performed

ONLY

by a

qualified, safety-conscious technician.

The Series One controller is a time-fill mode controller, and has
sixteen (16) loading sequences to select. Make sure you avoid
over-filling the receiver!
Figure 2 lists loading times and number
of blowback pulses in each sequence. Use the chart as your
model;
select a sequence that suits your needs.