Appendix A - Wire Selection Tables
G
ENERAL
I
NSTRUCTION FOR
E
LECTRICAL
W
IRING
:
1. Refer to Table 7 to determine the required wire gauge for general wiring, such
as relay wiring. Calculate the permitted voltage fall with respect to loads
current, wire gauge, length of wires.
2. Refer to Table 8 to select wire gauge for detectors power supply wires. DO
NOT connect any device or load to detectors supply inputs.
Table 7. Maximum DC resistance at 68°F for copper wire
AWG
mm
2
Ohm per
100 ft.
Ohm per
100 meter
26
0.12 - 0.15
4.32
14.15
24
0.16 - 0.24
3.42
11.22
22
0.30 - 0.38
1.71
5.60
20
0.51 - 0.61
1.07
3.50
18
0.81 - 0.96
0.67
2.20
16
1.22 - 1.43
0.43
1.40
14
1.94 - 2.28
0.27
0.88
12
3.09 - 3.40
0.17
0.55
10
4.56 - 6.64
0.11
0.35
Wiring Gauge
1 Select “No. of detectors” connected on one circuit.
2 Select “wiring length” per your installation requirements.
3 Refer to “Power Supply Range” for voltage extreme applied.
Table 8. Wiring length in feet (meter)
No. of
Detectors
Recommended Wire Diameter
Power Supply
Range (VDC)
24
18
16
14
-
-
22-32
20
18
16
14
-
-
22-32
16
20
18 16 14 -
22-32
12
20
18 16 14 -
20-32
8
20
18 16 14 -
20-32
4 and less
20
18
16
16
14
20-32
Feet
164
328 492 656 820
(meter)
(50)
(100) (150) (200) (250)
Max. Length from Power Supply to Last