beautypg.com

Spectrex 20/20MI - Mini Triple IR (IR3) Flame Detector User Manual

Page 40

background image

Spectrex Inc. - SharpEye

TM

Mini IR3 Flame Detector Manual – TM 787100, Rev. D April 2011

32

7.4.1 Manual BIT Test


Momentarily connecting PIN number 11 or yellow wire with PIN 2 or black wire
performs manual BIT.

Important Note!

If the function setup “Alarm BIT” is in YES, then the Alarm and 4-20mA Output will
be activated during a manual BIT, therefore, automatic extinguishing systems or
any external devices that may be activated during BIT must be disconnected.

1

Verify that the detector is operated properly.

2

Initiate manual BIT. After a few seconds the following occurs:
• Alarm Relay will be activated and the 4-20mA output turns to 15mA for 3

seconds (only if “Alarm BIT” at YES).

• The LED should light constant red for 3 seconds.

• Fault Relay should stay N.O during the test.

7.4.2 Testing with Fire Simulator Model 20/20-310 (see Appendix B)

This test simulates an exposure of the detector to a real fire condition. The
detector is exposed to radiation at the required detection level. As a result the
detector must generate a Fire Alarm signal.

Important Note!

If the detector is exposed to a fire simulator, the Alarm Relay and 4-20mA will be
activated during the simulation. Therefore, automatic extinguishing systems or
any external devices, which may be activated during this process, must be
disconnected.

1

Apply power to the system and wait up to 60 seconds for turning of the
detector to normal state. The LED flash (1 Hz) at green. If the detector is on,
skip this step.

2

Aim the Spectrex Fire Simulator Model 20/20-310 at the target point of the
detector (see Fig. 15), in a way that the radiation emitted by it is facing
directly towards the detector. (See appendix B)

3

Press the operation button once. After few seconds,
• The LED should light constant at red for a few seconds.

• The 4-20mA output should turn to 15mA for a few seconds and then

return to 5mA.

• The Alarm Relay should also turn on to this period.


This completes the installation procedure. The detector and system are now ready
for operation.