Operating instructions operating control – SnowEx SP-7000 Owners Manual User Manual
Page 6

6
© TrynEx International 2014 F51537 REV-A141205
Operating Instructions
Operating Control
Use the ON and OFF buttons to control the main power to the spreader.
Use START/STOP to turn the spinner and auger on and off. Use this as a pause button between passes or jobs.
Adjust SPINNER and AUGER speeds with the two sets of arrows. Speed will be displayed on the screens. Adjust to get your desired spread
width and application rate – ‘Spread Pattern.’
Use the Vibrator to loosen ‘bridged’ material and improve flow to the auger with the VIBRATE button. The vibrator does not have to be on
continuously.
BLAST turns both spinner and auger to max for as long as the button is held.
Turn the spreader OFF when you are done spreading and the machine is parked. The settings will remain for next time the spreader is used.
- SD-95 (24 pages)
- PWS-100 (40 pages)
- PPT-175 (1 page)
- PMT-175-C (3 pages)
- PMT-175 (3 pages)
- OFK-020 (2 pages)
- MGK-020 (2 pages)
- HRK-020 (8 pages)
- GAK-020 for SP-575 and SP-1075 (2 pages)
- DRM-175 (2 pages)
- ADF-020 For SP-575 and SP-1075 (2 pages)
- PWX-200 (28 pages)
- RHT-375 (2 pages)
- RHT-380 (12 pages)
- SD-600 Installation (12 pages)
- SD-600 Owners Manual (12 pages)
- TPR-020 (2 pages)
- SL-80 (28 pages)
- SP-100 (25 pages)
- SP-575X (28 pages)
- SP-725G (21 pages)
- SP-125 / US-100 (27 pages)
- SP-1575 (32 pages)
- SP-65 (24 pages)
- SP-3000 (31 pages)
- Bulk-Pro 1875 (51 pages)
- SP-2400 (35 pages)
- SP-2200 (36 pages)
- SP-7000 Assembly Instructions (12 pages)
- SP-7550 (36 pages)
- SP-85 (28 pages)
- SP-8550 (37 pages)
- SP-8500 (34 pages)
- SR-110 (28 pages)
- VBR-400 (12 pages)
- SP-9800X (40 pages)
- SP-9500X (40 pages)
- SP-9300X (40 pages)
- SP-9300 (40 pages)
- Wireless Spreader Key Fob Mating (1 page)
- SS-4000 (24 pages)
- SSH-175 (1 page)
- TLR-175 (1 page)
- TPM-175 (1 page)