beautypg.com

Davey RAINBANK WALL MOUNTED CABINET SYSTEM User Manual

Page 13

background image

13

8. Cable tie the power lead from the pump to pipework and plug into base of RainBank

®

.

9. Open Mains water valve and check for leaks.

10. Switch on power to RainBank

®

and check for flashing green light – light will flash

ten times as it boots up.

11. Open a tap downstream of RainBank

®

to clear lines of air and check for leaks.

12. Press manual override button on top of RainBank

®

to start the pump and clear

air from rainwater lines. There must be rainwater inside the tank – this is an
important part of commissioning the system.

13. Close tap and check for leaks.

MAINS
WATER
SUPPLY

RAINWATER
SUPPLY

TO TOILETS
AND LAUNDRY

Power to pump via
3 pin socket

Incoming power to RainBank®
via 3 pin plug