En g l is h english – Pfister GT49-CB0Y User Manual
Page 4

E
N
G
L
IS
H
ENGLISH
ENGLISH
DRAIN BODY INSTALLATION
15
FAUCET FUNCTIONS
12
13
16
14
12 HOSE CONNECTION TO VALVE BODY
Slide the End Connectors (12A) with arrow (12D) pointing up onto the Valve Bodies
(12B). Push the End Connectors (12A) all the way up until completely seated. Be
careful not to damage O-Rings (12C). Place Clips (12E) onto End Bodies (12C) to
secure End Connectors (12A).
13 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (13A) to Faucet Inlets (13B). Hot water supply lines go
into left inlet. Cold water supply lines go into right inlet. (Supply lines not included).
Please follow manufacturer’s instructions when installing supply lines.
14 POP-UP INSTALLATION
Install and adjust Pop-Up (14A) using separate instructions supplied with the Pop-Up
assembly.
15 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
16 FAUCET FUNCTION
COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-clockwise,
open-counterclockwise.
Note: Flush faucet before turning on valve (see step 17).
4
13B
13A
13B
13A
HOT
COLD
HOT
COLD
OPEN
OPEN
12A
12A
12D
12D
12B
12B
12C
12C
12A
12E
12E
12E
14A