Progressive International Electronics RLM 2 User Manual
Page 24
![background image](/manuals/358766/24/background.png)
RLM Systems Installation Guide
Version 3.0 © November 2008
18
RLM II for ELECTRONIC DISPENSERS
Dispenser Specific Installation
RLM II for Tokheim Electronic Dispenser
Note all warnings at the beginning of installation section.
Following the instructions in RLM II General Installation, perform general installation
procedure and the preliminary test procedure using Tester/WinTester program.
Proceed with RLM II installation, referencing Diagram: RLM II Adapter Board Jumper
Selections in the preceding section — RLM II for Electronic Dispensers, General Installation.
1. Set switch position SW1 of Adapter Board for Tokheim models.
2. Determine the type of electrical communications used by the Tokheim system. Match
the RLM II with the Tokheim system by making the corresponding switch selection on
SW2 of the Adapter Board. For Tokheim M98 and M94 Power Centers or 67
DBoxes, make the Tokheim Standard selection. For the 67B DBox, make the
RS422/RS485 selection on SW2. Note that communication for the 67 and 67B
DBoxes can be modified in the field, so that model number may not accurately reflect
the communication method. Contact the Tokheim service company responsible for site
service to confirm DBox settings.
3. Connect adapter cable:
C
Standard Tokheim — Plug adapter cable, PIE 9000 15 3011, into position J2
of the Adapter Board.
C
RS422/RS485 — Plug adapter cable, PIE 9000 15 3011, into position J3 of
the Adapter Board.
4. Locate the round black connectors on the existing console to DBox cable. Disconnect
the existing console/controller cable from the Tokheim M98/M94 Power Center, the
67 DBox, or the 67B DBox. Attach the RLM II adapter cable to the cable ends from
the console/controller and from the DBox/power center. Refer Diagram: RLM II for
Tokheim — Typical Installation.