Poly-Tex KOOL MART with Roll-up sides User Manual
Page 11
KOOL MART WITH ROLL-UP SIDES
1. Install the "V" brackets onto the center poles and intermediate
frame sections by inserting them into the pre-drilled holes.
2. Attach Inline fitting to power pole at appoximately 84". Attach
purlin to inline fitting and hoop tabs and adjust if necessary.
3. Install the basket purlin by hooking it on the basket purlin hooks.
4. Place bench tops on "V" brackets as shown.
5. Use flat stacker clips to secure bench tops to "V" brackets on
each end of the four center benches using thumb screws.
See Page 9 for preferred ballast installation, and page 10 for
alternate Water tube installation.
BMS1120
V-BRACKET
KHR1048 V-BRACKET
W/BASKET PURLIN HOOKS
BASKET
PURLIN
HOOK
BASKET
PURLIN
HOOK
GM4000 PURLIN
5/16" X 1 1/4"
CARRIAGE BOLT,
LOCK WASHER,
& HEX NUT
INLINE FITTING
5/16" X 1 1/4"
CARRIAGE BOLT,
LOCK WASHER
& HEX NUT
APPROXIMATELY
84"
KM2015
KM BENCH FRAME
KM2003
V-BRACKET
KM2003
V-BRACKET
KM2015
KM BENCH FRAME
BMS1121
V BRACKET
PLACING BENCH TOPS
BASKET PURLIN
GM4000
BENCH TOP
FLAT STACKER CLIP
THUMB SCREW
1
2
3
5
4