beautypg.com

Operating instructions, Preparing the mojack pro for use (steps 1 - 8) – MoJack PRO User Manual

Page 6

background image

MoJack PRO Lift

MoJack PRO Lift

10

11

Tower

Locking Pin

(locked position)

Operating Instructions

Preparing the MoJack PRO for Use (Steps 1 - 8)

STEP 1

Unfolding MoJack PRO
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower by pulling up on the Grip Handle. Once the
Tower is in the vertical position, lift up on the Grip Handle and
drop the Tower into the Base.
• Lock the Tower into place by rotating Tower Locking Pin until
the pull ring retracts into the locking slot.

Tower

Locking Pin

Tower

Locking Pin

Some steps of the Operating Instructions are repeated from the

Assembly Instructions. The Operating Instructions will show a full

working cycle of the MoJack PRO.

Before using the MoJack PRO, carefully read this manual in its entirety.

Push Pin

Lift Arm Insert

Wheel Pad

Lift Arm

Push Pin

Lift Arm Insert

Lift Arm Insert

Push Pin

STEP 4

Installing Wheel Pads
• Slide Wheel Pads onto Lift Arm Inserts and
temporarily secure with Push Pins.

STEP 3

Installing Lift Arm Inserts
• Slide Lift Arm Inserts into both sides of the
Lift Arm and secure with Push Pins.

STEP 2

Installing Lift Arm
• Hang the Lift Arm on the Carrier by hooking the slotted area
of the lift Arm under the top bar of the Carrier. Lift Arm must
be inserted from the front and then lowered which fastens
Lift Arm into place.
• Secure Lift Arm to Carrier with Clevis Pin and Hair Pin.

Clevis Pin

Hair Pin

Lift Arm

Top Bar of Carrier

Slotted Area

Operating Instructions