Operating instructions, Preparing the mojack pro for use (steps 1 - 8) – MoJack PRO User Manual
Page 6
MoJack PRO Lift
MoJack PRO Lift
10
11
Tower
Locking Pin
(locked position)
Operating Instructions
Preparing the MoJack PRO for Use (Steps 1 - 8)
STEP 1
Unfolding MoJack PRO
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower by pulling up on the Grip Handle. Once the
Tower is in the vertical position, lift up on the Grip Handle and
drop the Tower into the Base.
• Lock the Tower into place by rotating Tower Locking Pin until
the pull ring retracts into the locking slot.
Tower
Locking Pin
Tower
Locking Pin
Some steps of the Operating Instructions are repeated from the
Assembly Instructions. The Operating Instructions will show a full
working cycle of the MoJack PRO.
Before using the MoJack PRO, carefully read this manual in its entirety.
Push Pin
Lift Arm Insert
Wheel Pad
Lift Arm
Push Pin
Lift Arm Insert
Lift Arm Insert
Push Pin
STEP 4
Installing Wheel Pads
• Slide Wheel Pads onto Lift Arm Inserts and
temporarily secure with Push Pins.
STEP 3
Installing Lift Arm Inserts
• Slide Lift Arm Inserts into both sides of the
Lift Arm and secure with Push Pins.
STEP 2
Installing Lift Arm
• Hang the Lift Arm on the Carrier by hooking the slotted area
of the lift Arm under the top bar of the Carrier. Lift Arm must
be inserted from the front and then lowered which fastens
Lift Arm into place.
• Secure Lift Arm to Carrier with Clevis Pin and Hair Pin.
Clevis Pin
Hair Pin
Lift Arm
Top Bar of Carrier
Slotted Area
Operating Instructions