beautypg.com

Operation, Opera t ion – Alamo 1595 User Manual

Page 77

background image

OPERATION

1595 01/11

Operation Section 4-33

© 2011 Alamo Group Inc.

OPERA

T

ION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make
it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.

Leave dirt in bucket. Dumping on each pass wastes
time.