beautypg.com

Installation, A-7 across the arc set-ups – Lincoln Electric IM10079 LN-25 PRO DUAL POWER User Manual

Page 16

background image

A-7

INSTALLATION

LN-25™ PRO DUAL POWER

A-7

ACROSS THE ARC SET-UPS

CC Power Sources with Output Terminals Always
Hot (See Figure A.5)

If the power source has a Remote/Local switch, place
the switch in the Local position.

Place the CV/CC switch in the feeder in the "CC" posi-
tion.

CV

Power Sources with Stud Connectors and

Remote/Local Switch (See Figure A.6)

Place the power source Remote/Local switch in the
Local position.

Place CV/CC switch in the feeder in the "CV" position.

K#

K2614-6, -8

KP1695-XX
KP1696-XX
KP1697-XX

See Magnum Literature

K1803-XX

Description

LN-25™ PRO Dual Power,

PRO Dual Power European

Drive Roll Kit

Welding Gun

CC power Source

Welding Cables

POWER SOURCE TO LN-25™ PRO
CABLE CONNECTION DIAGRAMS

K#

K2614-6, -8

KP1695-XX
KP1696-XX
KP1697-XX

See magnum Literature

K1803-XX

K484

Description

LN-25™ PRO Dual Power,

PRO Dual Power European

Drive Roll Kit

Welding Gun

CV power Source

Welding Cables

Jumper Plug kit

Work clip

Work

Electrode

LN-25™ PRO

DUAL POWER

CC Power Source

Classics
Big Red’s
Eagle 10,000 Plus
Pipeliner 200D Without Wire Feed module
SAE’s Without CV Adapter

SAE 400 with CV adapter
Engine Driven welder with
Wire Feed Module

Work clip

Work

Electrode

Jumper

CV-655
DC-400
DC-600
DC-655
V450-Pro

SAE 400 with CV adapter
Engine Driven welder with
Wire Feed Module
Ranger 250 GX

LN-25™ PRO
DUAL POWER