3 schematic drawing of installation, 4 power supply – Yuh Dak SIC-A series User Manual
Page 16
5.3 Schematic Drawing of Installation
5. Installation
5-3
Water chiller
Process water outlet
Process water inlet
Cooling water circulation
Cold water circulation
Mould cooling
Cooling chamber
Hydraulic oil cooling
Make sure that power supply is the same as required before installation.
SIC-A series should be connected with 3
400V power supply and earth wire.
5.4 Power Supply
Before connecting the machine with power supply, please make sure
that main switch is turned off!
9
10
11
12
Cooling water pump
7
Water discharge port
Water refill port
Cooling tower