LevelOne FCS-5052 User Manual
Page 44
- 40 -
b. If Recurrence Pattern is selected, the following page will be displayed.
i.
An event schedule can be programmed to recur at different times
according to the user’s needs. Select the days for the event schedule to
occur. Select a start time and specify the duration.
3. Define what will trigger an event to occur by selecting an option from the Event
drop-down list.
4. Select the Actions that will occur when the event is triggered.