beautypg.com

Harrington Hoists and Cranes (N)ERCC Hoist - ((N)ER1) User Manual

Page 7

background image

7

Figure 3-2 Chain Container Installation

3.3 Mounting

Location

3.3.1

WARNING

Prior to mounting the hoist ensure that the suspension and it supporting

structure are adequate to support the hoist and its loads. If necessary consult a professional that
is qualified to evaluate the adequacy of the suspension location and its supporting structure.

3.3.2

NOTICE

See Section 6.7 of the EROM for outdoor installation considerations.

3.4

Mounting the Hoist

3.4.1

Manual Trolley - Follow instructions in Owner’s Manual provided with the trolley.

3.4.2

Motorized Trolley – Cylinder control model hoists are NOT intented to be used with motorized trolleys.

3.4.3

Hook Mounted to a Fixed Location - Attach the hoist’s top hook to the fixed suspension point.

3.4.4

CAUTION

Mount the hoist at a height that will allow the operator to maintain a clearance of at

least 4 inches between the Cushion Rubber and the hoist body during operation.

3.4.5

WARNING

Ensure that the fixed suspension point rests on the center of the hook’s saddle and

that the hook’s latch is engaged.

3.5 Electrical

Connections

3.5.1

CAUTION

Ensure that the voltage of the electric power supply is proper for the hoist.

3.5.2

DANGER

Before proceeding, ensure that the electrical supply for the hoist has been de-

energized (disconnected). Lock out and tag out in accordance with ANSI Z244.1 “Personnel Protection
-Lockout/Tagout of Energy Sources”.

3.5.3

Coiled Control Cable - The Coiled Control Cable connects to the hoist via a 5-pin (5P) or 8-pin (8P)
Plug and Socket. Make this connection as follows:

§ Refer to Figure 3-3.

§ Insert the 5P/8P Plug into the 5P/8P Socket on the hoist and hand tighten the Screw Coupling.